Ski Resorts News
04/16/2019
Kronplatz planning some innovations also for the upcoming winter season. One of the last two non-detachable chairlifts will be replaced by a gondola lift. The mountain and valley station of the Rara lift will be renewed and repositioned.
The new lift with the new CWA Omega V 10-cabins is built by Doppelmayr and replaces the chair lift built in 1989 with a capacity of 2,400 people/hour.
At the same time as the new gondola lift, the project provides a significant extension of the existing slopes, with a new track, which should improve the entire situation of the ski area in the area between Col Toron and Passo Furcia.
Latest Resort News
Schilthornbahn: World`s steepest cableway is open!
The world's steepest cable car starts operating. The new direct connection between Stechelberg and Mürren was officially opened the day before as part of a VIP opening ceremony. At the same time, the first section of the cable car between Mürren and Birg will go into operation.
12/15/2024
The new Plateau chairlift will enrich the Kronplatz ski area
Kronplatz, one of the premier ski destinations in the Dolomites, has introduced a state-of-the-art 8-seater chairlift named Plateau for the 2024/25 winter season. Located in the Olang sector, this new chairlift replaces the previous 4-seater, offering a significant upgrade in comfort and efficiency.
11/28/2024
Gourette ski area modernization
Gourette ski resort in the French Pyrenees has undergone significant modernization efforts for the 2024/2025 season. These upgrades aim to improve accessibility, efficiency, and the overall skiing experience. This new project, presented on September 5th...
11/20/2024